Media Center


PSCCHC News

12/7/2020 12:26:31 PM

West Port Said container terminal supports equipment fleet with (3) Rubber Tyred Gantry Cranes (RTGs)

On2nd.OfDecember2020, West Container Terminal took delivery of (3) (RTG) Rubber Tyred Gantry Cranes (Maximum Stable) manufactured by Shanghai Zhenhua Heavy Industry Co., Ltd. (ZPMC) at investment cost of 4 million448 thousand USD with lifting capacity of 40 tons load each, 18.4m stacking height of 1 over 5 High Cube stacks and 26.5m stacking width (5 plus truck lane wide).
New RTGswill enter service directly as they were supplied fully erected, so overallRTGsoperating in the terminalreach31 to raise terminal capacity and support handling efficiencyand it’s planned to supply additional (3) (RTG) Rubber Tyred Gantry Cranes with the same specifications within the company’s investment plan for 2021.
This step crowned the development plan adopted by Port Said Container and Cargo Handling Co. following comprehensive development carried out over the previous years.
The company is moving forward with development plans and achievements in order to raise the company's position in maritime market, hoping further progress and development for PSCCHC.

PSCCHC Press

1/17/2013

Important news

As a result of the development policy adopted by Port Said container and cargo handling Co. management and after dredging the approach channel and deepening the main container quay of West Port Said Container Terminal ,Suez Canal Authority reported that starting 17.01.2013 container vessels with draft13.5 meters (Phase 1) are allowed to enter and exit from the West Port Said port.

1/1/2009

Top 100 Container Ports || 2009

According to "World Port Development" magazine ,Port Said rank 31 with TEU throughput 2009: 3.470.000(+6.52%)